projects_enghello
Projects 2000-2006


projects_enghello
  • Project title: Defense system of the First World War 1915-1918. Second and third resistance and connection lines

  • Priority task: Human resources, cooperation and systems harmonisation
  • Project measure: Measure 3.2 - Cooperation in culture, communication, research and institutions for the systems between harmonisation

  • Project code: BAFVG332306
  • Users: "Torre, Natisone e Collio" Mountain Community
  • Partner:
    Foundation Poti miru v Posočju (Kobarid)
    Adminitrative Unity (Tolmin)

  • Description: The project hereby described aims at identifying and cataloguing a considerable section of the defense system (second and third resistance and connection lines), made up of trenches, weapon-pits, construction works, tunnels and other evidence; a footpath will be used, which follows the CAI (Italian Alpine Club) path called “Italia”; minor integrations will be performed where necessary, relying on the existing paths or mule-tracks. The sole purpose of the work to be performed is ensuring a safe access, whilst reducing to the minimum the new structures which will be built with natural local material, both for the track and for the structures of the deteriorated defense system, which is undergoing a careful renovation. Along the route, special signs will be placed to mark the most meaningful sites from the historical, environmental and natural points of view; in the spots where a panoramic view can be enjoyed, the vegetation will be thinned out in order to enable a full view. Some stones will be installed bearing metal plaques to indicate mountains or significant locations. Moreover the initiative aims at organizing info points, where telematic, video and paper supports will be available.To help tourists, other info points will be located in private owned commercial concerns such as bars, restaurants and hotels. The divulging work concerning the historical-cultural heritage of the First World War sites is carried out by surveying and cataloguing the defense system structures; a guide will be published, containing the catalogued documents, and also cards, charts and points of access to the system.
  • Homepage Url: http://www.grandeguerrafvg.it

  • Project data begin: December 2005
  • Project data end: February 2007
  • Approved costs: 240.000,00 €
  • Region / Statistical region: Gorizia, Trieste

List of beneficiaries

The list of beneficiaries, the names of providers and their projects, and the amount of public funding for projects is being made publicly available, each year in February, in line with Article 7 of Commission Regulation (EC) No 1828/2006 and the European Transparency Initiative (COCOF April 23, 2008).

List of beneficiaries of the CBC Programme Italy-Slovenia 2007-2013 (last update: February 2017